Corning Museum of Glass – Breaking Glass Bleachers featured in Architect’s Newspaper

In 2014, CRAFT | Engineering Studio collaborated with Smith-Miller+Hawkinson Architects to design the CMoG The Breaking Glass Bleachers to add additional auditorium space to an underutilized corner of the museum. To integrate design and analysis for the highly customized structure, the team developed an iterative process using within the Grasshopper environment using Karamba 3d as a real time FEA solver. The project was recently featured recently in the Architect’s Newspaper.

1310 Stress Diagram2

(Image Credit: Smith-Miller+Hawkinson Architects)

 

Facebooktwittergoogle_pluslinkedinmail
Facebooktwittergoogle_pluslinkedininstagram